BigWheel Upgrades

Tags: think and design
Personhours: 5
BigWheel Upgrades By Evan

Task: Fix some issues on BigWheel before the build freeze

We made more secure way of activating our hook, so we switched our piece of wire attaching the servo to the hook with a much stronger and less likely to bend strip of polycarb, which greatly improved the reliability of the hook.

As well, we limited the back and forth motion of our slides at their attaching points. I achieved this by inserting a small piece of drywall sandpaper in between the stages of the slides. Hopefully, the added friction will create a stronger hold between the stages fo the slide.

Next, we ground down a bolt to more securely attach the servo horn to the servo since it’s a REV hex shaft to servo adapter and the bolts we had didn’t fit inside well enough. Once that was done, we changed the ratio between the belt drive pulleys, going from a 1:1 (36 teeth to 36 teeth) to a 5:3 (60 teeth to 36 teeth) by increasing the size of the pulley at the motor. This should increase the quickness of our lift and hopefully let us squeeze a few more mineral pick up and depositing cycles in.

Next Steps

It's time to turn the robot over to the coders and drivers, so there won't be many changes after this,

Date | February 10, 2019