Meeting Log

Tags: think, innovate, and design
Personhours: 25
Meeting Log By Ben, Bhanaviya, Cooper, Jose, and Trey

Task: Prepare the portfolio and intake before the qualifier

The three of us worked on the engineering portfolio, discussing what we needed to get done in these 3 weeks between now and the qualifier. It was agreed that Ben, Bhanaviya, and Jose would be largely responsible for the portfolio and having other team members add information when necessary. We also began drafting an email to a physics professor who may help us with our physics calculations.

Trey and Justin mostly worked on rebuilding the ring intake to make it easier to mount onto the robot. They also rebuilt parts of it to make it easier to service in the future. There were little issues with this, although access to the robot was limited at times during code testing. Time constraints also played a role in the progress that was made.

Cooper had planned on calibrating the ticks/degree on the arm, implementing the trajectory calculator, fixing the LED on the robot, and making progress on Vuforia. By the end of the work period, he had successfully calibrated the ticks per degree on the robot arm and implemented the trajectory calculator. He decided to fix the LED later because of its low priority and time constraints restricted progress on Vuforia.

Next Steps

The next steps for the portfolio are to begin formatting and gathering information for all the subsystems and from team members. Once we have all the information, we will have to condense it into an easily-digestible 15 pages. We will also have to fix the LED lighting solution on the front of the robot, along with troubleshooting Vuforia.

Date | February 6, 2021