Meeting Log 2/18

Tags: journal and think
Personhours: 50
Meeting Log 2/18 By Alex, Anuhya, Sol, Gabriel, Aarav, Jai, Leo, David D, Georgia, and Krish

Task: Regional Prep, Portfolio Development, Underarm Wiring and new Shoulder and Turret Assembly

To start we began to bring the wiring for the UnderArm through our wiring sleeve. The current UnderArm wiring situation was less than ideal and it needed to be reworked. About half of our UnderArm’s wires were in a wire sleeve and today we added the rest to it. We need a flexible wire sleeve that can collapse in and extend out so the underarm system can extend properly without being limited by the wires and prevent tanglement. This particular design of sleeve with interlocked fibers provides that functionality and with some extra attachment points that were added today it effectively holds the wires in place during UnderArm extension. However, there was a slight mishap with one of the servo wires coming loose from its plastic case, so we had to take a quick detour and fix that, but we were able to fully finish rewiring the UnderArm.

Currently in terms of our portfolio we have been redesigning the layout to switch from a portrait to landscape orientation to hopefully better present out robot and create some buzz. In addition, we made some additions to the portfolio to increase its thoroughness, detail, and remove extranous blank space. We also made some changes and updates to the TauBot build guide to improve its quality and detail when it gets added to our Engineering Notebook for Regionals. Much of the new Shoulder and Turret assembly was not there, so we added the instructions along with a couple helpful pictures. Finally, we completed many more blog posts to catch the blog up to date in time for the Regional competition.

In terms of build, we attached our new motor mounts that we printed overnight and are a lot closer to finally finishing the whole Shoulder and Turret assembly, although both axles still require significant work.

Next Steps

Our next steps are to continue to train our new recruits to help make them more valuable assets to the team. We also need to finish TauBot build as well as to finish code testing and preparing for Regionals in both presentation and portfolio, as well as start thinking about our Regional booth.

Date | February 18, 2023